SocialPro Product Designer 2023—2024 SaaS · Enterprise

Contractors managing $10B+ in projects were filing reports by hand.

SocialPro is a cloud platform that helps construction companies track social procurement compliance. The reporting tools were cluttered and slow — I redesigned them. Submissions went up 22%.

Role
Product Designer
Project length
2023 – 2024
What shipped
Redesigned compliance reporting module
Impact
+22% report submissions · 30% faster
+22%
report submissions
−30%
submission time
2x
active businesses in 6 months
SocialPro reporting dashboard — compliance tracking and workforce data

The Problem

Three user groups, one broken workflow

Contractors found reporting cluttered and time-consuming. Subcontractors felt overwhelmed during onboarding. Compliance officers lacked real-time visibility. The friction was costing the platform adoption.

"I spend more time figuring out where to enter data than actually entering it."

— Contractor, user interview

Research

The insight that reframed the whole project

Interviews with 12 contractors across three tiers revealed a critical mismatch: 80% entered data weekly in small increments, but the reporting form was designed for bulk monthly entry. Every field, every flow, every validation assumed a user sitting down once a month to file everything at once. That single assumption was the root cause behind most of the frustration, abandonment, and support tickets.

Key Insight

We optimized for frequent small submissions instead of rare large ones. This meant lighter forms, inline editing, and persistent draft states so users could pick up where they left off without losing progress.

Process

Sketches first, pixels later

Hand-drawn sketches and low-fidelity wireframes went to stakeholders weekly — catching usability issues before they got expensive.

Hand-drawn wireframe sketches of the SocialPro dashboard, forecasting module, and project reports — early explorations mapping layout and data hierarchy
Early wireframe sketches — dashboard, forecasting, and reporting views mapped out before opening Figma

Design Solutions

Four modules, each solving a real pain point

Project Dashboard

A control center surfacing workforce, spend, and local content metrics at a glance — so contractors stop digging through nested pages for basic numbers.

Labour Hours

Now managed through interactive tables inline. No more switching between separate forms. Enter hours, review, submit — all in one flow.

Social Spend

A guided form: search suppliers by ABN, select certifications, enter invoice details, upload documents. Entries appear in a reviewable table with filter, edit, and remove.

Local Content

A simplified interface for adding and managing local content items. Side panel for quick selection — allocate contract values, assign suppliers, track targets in one place.

SocialPro local content reporting — allocation tracking with side panel for item selection

Hard Decision

We debated building a bulk upload feature for large contractors with hundreds of line items. Instead, we invested in inline editing with persistent drafts. It was a riskier bet since some enterprise users explicitly asked for bulk upload, but the data showed weekly incremental entry was the dominant pattern. Post-launch, even the large contractors preferred the new flow.

Mapping the User Journey

Visualising the end-to-end experience exposed hidden friction

Journey maps across all three user groups revealed critical touchpoints — moments of confusion, redundant steps, and dead ends that weren't visible from the interface alone.

SocialPro user journey map — end-to-end reporting workflow

Design Highlights

Key screens from the redesign

High-fidelity designs built on low-fidelity feedback — balancing visual hierarchy with functionality to keep complex data accessible and actionable.

SocialPro project dashboard — metrics overview

1. Project Dashboard

A comprehensive control center displaying key metrics including workforce, spend, and local content — so contractors stop digging through nested pages for basic numbers.

SocialPro forecasting module

2. Forecasting

Enables users to project targets and track metrics like labour hours, spend, and local content in real time. Compliance officers get the visibility they need; contractors can course-correct before deadlines, not after.

SocialPro monthly reports

3. Project Reporting

I redesigned the Project Reporting module, enabling users to forecast targets and monitor labour hours, spend, and local content metrics in real time — making reporting faster and more transparent.

22% increase in report submissions across the platform

Report Confirmation

Users finalise submissions by reviewing a summary and confirming agreement to terms. A clean handoff that reduces errors and builds audit confidence.

SocialPro labour hours module

Labour Hours

Interactive tables enable direct labour hour management, streamlining submission and eliminating separate form requirements. Enter hours, review, submit — all in one flow.

SocialPro social spend module

Social Spend

Structured, guided form interface that minimises data entry confusion. Users search suppliers via ABN, select certifications, enter invoice details, and upload documents centrally. Entries appear in reviewable tables with filter, edit, and remove capabilities.

SocialPro local content module

Local Content

Simplified interface for managing local content items. Side panel enables rapid item selection — allocate contract values, assign suppliers, and monitor target progress in one place.

Impact

The numbers tell the story

30% decrease in submission time, 22% increase in report submissions, and active businesses doubled from ~250 to 532 within six months, managing $10B+ in projects.

"SocialPro has transformed the process, ensuring clarity, efficiency, and seamless collaboration across all our projects. Their intuitive platform streamlines reporting, enabling better decision-making and improved outcomes at every stage."
Ana Buljubasic · Contracts Administrator, Stilcon

Next project

SaveInGold — Gold Trading App →